Comparison Of Predicted Versus Observed Structural Displacements Of Existing Structures At The Port Of Miami

Synopsis: The Port of Miami Tunnel Project is currently being constructed near downtown Miami, Florida to relieve congestion downtown due … Read more »

Lessons Learned from NATM Design and Construction of the Caldecott Fourth Bore

Synopsis: The Caldecott Fourth Bore is a 15.2 m wide (50 ft), 1,036 m long (3,399 ft) highway tunnel with … Read more »

Non-Disruptive Alternatives for Grade Separation Projects in Urban Settings Using Very Shallow Conventional Tunneling

Synopsis: The construction of the approximately 520 meter long, twin soft ground single-track Metrorail guideway tunnels at Tysons Corner, Virginia … Read more »

Prediction of behavior of structures due to large bore EPBM tunneling at the Port of Miami

Synopsis: The Port of Miami Tunnel Project (POMT) consists of twin Earth Pressure Balance Tunnel Boring Machine (EPBM) tunnels excavated … Read more »